Being a leader in the service industry means we see a lot of equipment come through our doors. With that in mind we've seen a wide array of equipment failures. Listed below is a summation of repair history for the Signal Gen/Synthesizers/Sweepers category.
Failure | Occurrences * | Avg. Turnaround Time ** |
---|---|---|
Defective Low Band Module | 21 | 19 Days |
Defective Reference Assembly | 22 | 11 Days |
Defective High Band Output Board | 23 | 19 Days |
Defective RF Output | 33 | 12 Days |
Defective CPU | 41 | 14 Days |
Defective RF Output Circuitry | 49 | 22 Days |
Defective Output Board | 53 | 8 Days |
Defective RF Doubler | 53 | 45 Days |
Defective RF assembly | 57 | 24 Days |
Does Not Power On | 61 | 16 Days |
Display Failure | 64 | 15 Days |
Defective Frac N assembly | 107 | 10 Days |
Defective Power Supply | 170 | 23 Days |
Defective Frac N Circuit | 203 | 9 Days |
Defective Attenuator | 319 | 15 Days |
Occurrences *
Number of times we've repaired this model for the given failure.
Avg. Turnaround Time **
This is the average number of days it takes to repair the given failure. This is based on the number of days from the time the item is received to when we send you our evaluation plus the number of days from when we receive your approval to when we ship it out.